ML
    • Recent
    • Categories
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    Held Hostage By A Vendor

    Scheduled Pinned Locked Moved IT Discussion
    12 Posts 8 Posters 1.4k Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • scottalanmillerS
      scottalanmiller
      last edited by

      From a complexity standpoint it might be true. NTG makes products like this and we do not allow customers to install it themselves. We only do it, onsight, with our own engineers.

      However, we do it as part of a service contract and are not charging for that work. So from a complexity standpoint, it is similar. From a hostage standpoint, we hope that it is not.

      1 Reply Last reply Reply Quote 3
      • ?
        A Former User
        last edited by

        Rockwell SCADA software is very expensive. and if this includes their customizations on it that is not an unusually high price.

        They (third-party Rockwell Engineering) gave me the option of doing it my self or having them do it. I chose to have them do it considering this ran the pumps for the whole towns water supply and also prevented overflows.

        1 Reply Last reply Reply Quote 0
        • C
          Carnival Boy
          last edited by

          I remember a few years ago we needed some customisation or other and the vendor quoted a day's labour at around $1000. I sent the order over and less than an hour later I got a reply from the programmer saying he'd completed the work. I was like "you could at least have pretended it took you over an hour to make me feel better!"

          Anyway, we're in the same point with some software to run our testing machines. The program apparently needs re-writing to support Windows 7 and that quote runs in to tens of thousands as well. I think we're going to stick with XP.

          1 Reply Last reply Reply Quote 0
          • garak0410G
            garak0410
            last edited by

            Thanks for the insight...so, we really to invest in one of these options and perhaps I can make an image of the new machines and use that for Disaster Recovery?

            scottalanmillerS 1 Reply Last reply Reply Quote 0
            • scottalanmillerS
              scottalanmiller @garak0410
              last edited by

              @garak0410 said:

              Thanks for the insight...so, we really to invest in one of these options and perhaps I can make an image of the new machines and use that for Disaster Recovery?

              That's a good idea. Try virtualizing too (P2V) to see what your options are.

              1 Reply Last reply Reply Quote 0
              • thanksajdotcomT
                thanksajdotcom
                last edited by

                I don't know if their claims of complexity are overly-exaggerated or not, but it sounds like what they are charging you for is the labor of their engineers. Without knowing the software and your environment/setup, I can't comment on whether that seems steep, but everything a business gets charged for is a much higher rate than it probably should be.

                1 Reply Last reply Reply Quote 0
                • Bill KindleB
                  Bill Kindle @garak0410
                  last edited by

                  @garak0410 said:

                  When it comes to Engineering and manufacturing software, it's not typically something you want to become responsible for. If they offer, let them have it. Deflects blame from you to them. Since the software is custom, I wouldn't touch it even if I could.

                  coliverC 1 Reply Last reply Reply Quote 1
                  • coliverC
                    coliver @Bill Kindle
                    last edited by

                    @Bill-Kindle said:

                    @garak0410 said:

                    When it comes to Engineering and manufacturing software, it's not typically something you want to become responsible for. If they offer, let them have it. Deflects blame from you to them. Since the software is custom, I wouldn't touch it even if I could.

                    I'd have to agree with this. We have a few PLCs that are super finicky and have no interface for support. Whenever something comes up we have to call our vendor or manufacturer (a Swiss company) to get them fixed.

                    scottalanmillerS 1 Reply Last reply Reply Quote 2
                    • scottalanmillerS
                      scottalanmiller @coliver
                      last edited by

                      @coliver Welcome to the community!!

                      1 Reply Last reply Reply Quote 0
                      • DashrenderD
                        Dashrender
                        last edited by

                        We were looking at this same issue a few months ago - we lucked out and a technician did the upgrade to our new machine, though I'm pretty sure he wasn't suppose to.

                        ? 1 Reply Last reply Reply Quote 0
                        • ?
                          A Former User @Dashrender
                          last edited by A Former User

                          I was always told no support was offered on PLC/SCADA stuff if we did it our selfs. The upgrade from them usually comes with 1-3 year support. going cheaply in this area when they can control so much just may cost you your job if something goes wrong.

                          1 Reply Last reply Reply Quote 1
                          • 1 / 1
                          • First post
                            Last post