ML
    • Recent
    • Categories
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    Cost Study: 4 Node Scale vs. 4 Node VMware IPOD

    IT Discussion
    scale scale hc3 vmware esxi emc san storage inverted pyramid of doom ipod cost comparison
    7
    44
    8.7k
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • scottalanmillerS
      scottalanmiller
      last edited by scottalanmiller

      A cost difference of $67,594 is pretty significant for any SMB. Considering all of the negatives that come with the inverted pyramid approach, this is a staggering cost to have to bear to do it reasonably well. And this before we consider the large expected installation costs and ongoing support costs.

      PSX_DefectorP 1 Reply Last reply Reply Quote 0
      • scottalanmillerS
        scottalanmiller
        last edited by

        Wow, what is amazing is that the cost of the EMC SAN, comes out alone to $17,000 more than the entire Scale solution! That's crazy. And that's not even a comparable product. It's expected to be less performance, less flexibility and less reliable. We got super lucky in this comparison that EMC's two example SAN units for their entry level map exactly to the two Scale clusters that we want to compare. We could not have asked for closer examples.

        0_1482305634260_Screenshot from 2016-12-21 02-30-54.png

        So even before we consider one penny of the cost of the servers, of licensing, setup, labor, maintenance, the Scale solution has already won on features and on price.

        Also worth noting, the hyperconverged approach is a 4U solution, rather than a 10U.

        1 Reply Last reply Reply Quote 0
        • scottalanmillerS
          scottalanmiller
          last edited by

          I was not expecting the cost difference to be so large. That's an unbelievably different cost range!

          dafyreD 1 Reply Last reply Reply Quote 0
          • dafyreD
            dafyre @scottalanmiller
            last edited by

            @scottalanmiller said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

            I was not expecting the cost difference to be so large. That's an unbelievably different cost range!

            And it gets even bigger if you actually build the 4-Node VMware + SAN to not be an IPOD.

            scottalanmillerS 1 Reply Last reply Reply Quote 0
            • scottalanmillerS
              scottalanmiller @dafyre
              last edited by

              @dafyre said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

              @scottalanmiller said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

              I was not expecting the cost difference to be so large. That's an unbelievably different cost range!

              And it gets even bigger if you actually build the 4-Node VMware + SAN to not be an IPOD.

              If you add a second SAN? Yeah, then it's crazy.

              1 Reply Last reply Reply Quote 0
              • DashrenderD
                Dashrender
                last edited by

                Scott will soon be adding vCenter - forgot the single pain of glass software for a system larger than the VMWare Essentials

                scottalanmillerS 1 Reply Last reply Reply Quote 0
                • scottalanmillerS
                  scottalanmiller @Dashrender
                  last edited by

                  @Dashrender said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                  Scott will soon be adding vCenter - forgot the single pain of glass software for a system larger than the VMWare Essentials

                  Yup, overlooked that since it was included at three nodes.

                  1 Reply Last reply Reply Quote 1
                  • htbaseH
                    htbase
                    last edited by htbase

                    Would you mind if I add HTBase's HyperTask to the comparison?

                    Four node system with 2x Intel Xen E5-2650v4 per node, 256GB per node, 6TB of SSD per node.

                    Total cost (including 4 nodes and 3 years support):

                    $71,600

                    DashrenderD scottalanmillerS 2 Replies Last reply Reply Quote 1
                    • DashrenderD
                      Dashrender @htbase
                      last edited by

                      @htbase said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                      Would you mind if I add HTBase's HyperTask to the comparison?

                      Four node system with 2x Intel Xen E5-2650v4 per node, 256GB per node, 6TB of SSD per node.

                      Total cost (including 4 nodes and 3 years support):

                      $71,600

                      Need the 5 year support so that it matches the timeframe. I don't recall, are these the same processors Scott listed in the other thread?

                      htbaseH scottalanmillerS 2 Replies Last reply Reply Quote 0
                      • htbaseH
                        htbase @Dashrender
                        last edited by

                        @Dashrender Processors are better in our case compared to the original thread.

                        To add 2 additional years of support, you would just be adding $5K, bringing the total to $76,600

                        Still a good price when compared

                        DashrenderD 1 Reply Last reply Reply Quote 2
                        • scottalanmillerS
                          scottalanmiller @Dashrender
                          last edited by

                          @Dashrender said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                          @htbase said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                          Would you mind if I add HTBase's HyperTask to the comparison?

                          Four node system with 2x Intel Xen E5-2650v4 per node, 256GB per node, 6TB of SSD per node.

                          Total cost (including 4 nodes and 3 years support):

                          $71,600

                          Need the 5 year support so that it matches the timeframe. I don't recall, are these the same processors Scott listed in the other thread?

                          No, he used slightly higher end procs, the 2650 instead of the 2620

                          1 Reply Last reply Reply Quote 0
                          • DashrenderD
                            Dashrender @htbase
                            last edited by

                            @htbase said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                            @Dashrender Processors are better in our case compared to the original thread.

                            To add 2 additional years of support, you would just be adding $5K, bringing the total to $76,600

                            Still a good price when compared

                            So you have 6 TB SSD storage, what about the 32 TB of additional storage? really hoping to see an apples to apples comparison. granted, currently if you just added 32 TB of HDD, you'd be way ahead because you have 24 TB of SSD storage, vs the others having 8 TB of SSD storage.

                            htbaseH 1 Reply Last reply Reply Quote 0
                            • scottalanmillerS
                              scottalanmiller @htbase
                              last edited by

                              @htbase thanks for jumping in to the "mix".

                              htbaseH 1 Reply Last reply Reply Quote 0
                              • htbaseH
                                htbase @Dashrender
                                last edited by

                                @Dashrender Yep, in that configuration we have 24 TB of SSD.

                                If we added an additional 32TB of HDD (given the fact you would already have 24TB of SSD), it would add around $13,000 to the total cost provided before

                                DashrenderD 1 Reply Last reply Reply Quote 1
                                • htbaseH
                                  htbase @scottalanmiller
                                  last edited by

                                  @scottalanmiller :thumbsup_tone2:

                                  1 Reply Last reply Reply Quote 0
                                  • DashrenderD
                                    Dashrender @htbase
                                    last edited by

                                    @htbase said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                                    @Dashrender Yep, in that configuration we have 24 TB of SSD.

                                    If we added an additional 32TB of HDD (given the fact you would already have 24TB of SSD), it would add around $13,000 to the total cost provided before

                                    So rolling that all together (though we have no idea what it looks like in configuration) we have
                                    4 units (dual xeon 2650, 256 GB RAM, 6 TB SSD, 8 TB HDD, 5 yr warranty/support) = $89,600

                                    Is that right?

                                    So we have better processors, double the RAM and of the 56 TB of storage 30% more of it is SSD. right?

                                    htbaseH 1 Reply Last reply Reply Quote 0
                                    • DashrenderD
                                      Dashrender
                                      last edited by

                                      Scott didn't mention the RAID controller in his Dells, what kind of RAID are in your boxes? how about the warranty, what are the details?

                                      scottalanmillerS 1 Reply Last reply Reply Quote 0
                                      • scottalanmillerS
                                        scottalanmiller @Dashrender
                                        last edited by

                                        @Dashrender said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                                        Scott didn't mention the RAID controller in his Dells, what kind of RAID are in your boxes? how about the warranty, what are the details?

                                        No RAID with hyperconverged players. Not that there couldn't be, but no one uses one. Since everyone has to have RAIN anyway at a higher layer, having a RAID controller doesn't add any value. So none in the Scale, VSAN, Starwind or IPOD examples. Not just no RAID controller, no RAID at all. HTBase is the same in that regard.

                                        DashrenderD 1 Reply Last reply Reply Quote 2
                                        • DashrenderD
                                          Dashrender @scottalanmiller
                                          last edited by

                                          @scottalanmiller said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                                          @Dashrender said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                                          Scott didn't mention the RAID controller in his Dells, what kind of RAID are in your boxes? how about the warranty, what are the details?

                                          No RAID with hyperconverged players. Not that there couldn't be, but no one uses one. Since everyone has to have RAIN anyway at a higher layer, having a RAID controller doesn't add any value. So none in the Scale, VSAN, Starwind or IPOD examples. Not just no RAID controller, no RAID at all. HTBase is the same in that regard.

                                          for the uninitiated, you just blew my mind a little.

                                          travisdh1T scottalanmillerS 2 Replies Last reply Reply Quote 1
                                          • travisdh1T
                                            travisdh1 @Dashrender
                                            last edited by

                                            @Dashrender said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                                            @scottalanmiller said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                                            @Dashrender said in Cost Study: 4 Node Scale vs. 4 Node VMware IPOD:

                                            Scott didn't mention the RAID controller in his Dells, what kind of RAID are in your boxes? how about the warranty, what are the details?

                                            No RAID with hyperconverged players. Not that there couldn't be, but no one uses one. Since everyone has to have RAIN anyway at a higher layer, having a RAID controller doesn't add any value. So none in the Scale, VSAN, Starwind or IPOD examples. Not just no RAID controller, no RAID at all. HTBase is the same in that regard.

                                            for the uninitiated, you just blew my mind a little.

                                            @Dashrender I was SO confused the first few times I ran into RAIN being discussed.

                                            1 Reply Last reply Reply Quote 0
                                            • 1
                                            • 2
                                            • 3
                                            • 1 / 3
                                            • First post
                                              Last post